The CIS Networking Group will be swapping out a UPS in the 5th floor networking closet on Tuesday, Oct. 25th, 6am-7am. The networking switches in the closet will loose power during this maintenance.  These switches provide networking connections to southwest section of the CIT building on the 4th and 5th.

The following rooms on the 4th and 5th floor will be affected by this:

400, 451, 443, 445, 447, 449, 451, 453, 455, 458, 460, 465, 467, 468, 469, 470, 471, 472, 473, 475, 477, 479, 480, 482

500, 531, 543, 545, 546, 547, 548, 549, 551, 553, 555, 566, 567, 568, 569, 570, 572, 573, 575